Self-Starting Can Be Hard to Do—Understanding Power-on-Reset Requirements in Regulators and Bandgaps
关键词: Self-start, op amp, buried zener, bandgap, parasitic device, triac, electrostatic discharge, ESD, PTAT, proportional to absolute temperature, Schottky diode, power on reset, POR, voltage reference
Abstract: Self-starting is a necessary but sometimes difficult task, whether it is motivating humans, starting cold automobiles, or providing power-on-reset (POR) for ICs. PORs ensure systems start in known and safe states. We will discuss several misapplications of this technology and how designers can avoid startup problems.
Self-Starting Can Be Hard to Do—Understanding Power-on-Reset Requirements in Regulators and Bandgaps.pdf
共1条
1/1 1 跳转至页
Self-Starting Can Be Hard to Do—Understanding Power-on-Reset Requirements in Reg
共1条
1/1 1 跳转至页
回复
有奖活动 | |
---|---|
【有奖活动】分享技术经验,兑换京东卡 | |
话不多说,快进群! | |
请大声喊出:我要开发板! | |
【有奖活动】EEPW网站征稿正在进行时,欢迎踊跃投稿啦 | |
奖!发布技术笔记,技术评测贴换取您心仪的礼品 | |
打赏了!打赏了!打赏了! |