共2条
1/1 1 跳转至页
lpc2131,lpc2132,50 lpc2131,或lpc2132到货了吗??急须啊,谁先卖50片救急啊。。
问
答 1:
我也急着用 5月中才开始供货。
答 2:
靠,我上次去买说4月底供货,5月中也不一定有啊。
答 3:
这个连接可能对你有帮助http://groups.yahoo.com/group/lpc2000/message/16022
答 4:
philips的正式答复From: "philips_marketing_usa" <philips_marketing_usa@...>
Date: Tue May 9, 2006 6:48 pm
Subject: Re: in production and no chips available !!! philips_mark...
Offline
Send Email
I apologize for the delay in responding to this thread.
In Q1, Philips was overwhelmed by a dramatic increase in demand as
many new designs went to production simultaneously. Even though we
were able to increase our chip production signifiCANtly, we still
were unable to keep up with the huge surge in demand.
We have increased production even further and are in the process of
getting ahead of the demand. By June, we should be completely
caught up and leadtimes should return to the 4-6 week range.
You should continue to expedite orders with your local
distributors. We are continually pulling in LPC2000 orders, so your
local contacts may be able to get you parts sooner than the original
confirmation date.
Please accept our sincerest apologies for the delays. It is a
testament to the success and acceptance of the LPC2000 family in the
marketplace that we have seen such an increase in demand. This
forum is undoubtedly an important factor in that success.
We believe that we have enough die and assembly production capacity
being put into place to keep leadtimes short and to keep our
distributors' shelves stocked with the most popular parts in the
future.
Sincerely,
Philips Microcontrollers Marketing and Sales
Date: Tue May 9, 2006 6:48 pm
Subject: Re: in production and no chips available !!! philips_mark...
Offline
Send Email
I apologize for the delay in responding to this thread.
In Q1, Philips was overwhelmed by a dramatic increase in demand as
many new designs went to production simultaneously. Even though we
were able to increase our chip production signifiCANtly, we still
were unable to keep up with the huge surge in demand.
We have increased production even further and are in the process of
getting ahead of the demand. By June, we should be completely
caught up and leadtimes should return to the 4-6 week range.
You should continue to expedite orders with your local
distributors. We are continually pulling in LPC2000 orders, so your
local contacts may be able to get you parts sooner than the original
confirmation date.
Please accept our sincerest apologies for the delays. It is a
testament to the success and acceptance of the LPC2000 family in the
marketplace that we have seen such an increase in demand. This
forum is undoubtedly an important factor in that success.
We believe that we have enough die and assembly production capacity
being put into place to keep leadtimes short and to keep our
distributors' shelves stocked with the most popular parts in the
future.
Sincerely,
Philips Microcontrollers Marketing and Sales
共2条
1/1 1 跳转至页
回复
我要赚赏金打赏帖 |
|
|---|---|
| 设备功耗web监控界面(ESP32C5)被打赏¥28元 | |
| OrangePiZero2W系统被打赏¥33元 | |
| Linux环境下以模拟方式快速实现出入管理功能测试被打赏¥24元 | |
| 树莓派3+Klipper,老3D打印机满血升级被打赏¥33元 | |
| OK1126B-S开发板下串口屏及其应用被打赏¥21元 | |
| 低功耗超声波液位测距仪(ESP32S3)被打赏¥27元 | |
| 在K230DBOX上实现多时段语音提示功能被打赏¥14元 | |
| 使K230DBOX实现相机持续拍照功能被打赏¥12元 | |
| 基于K230DBOX的文本管理器设计被打赏¥14元 | |
| 基于K230DBOX的彩色画板功能实现被打赏¥15元 | |
我要赚赏金
