lpc2131,lpc2132,50 lpc2131,或lpc2132到货了吗??急须啊,谁先卖50片救急啊。。

问
答 1:
我也急着用 5月中才开始供货。
答 2:
靠,我上次去买说4月底供货,5月中也不一定有啊。
答 3:
这个连接可能对你有帮助http://groups.yahoo.com/group/lpc2000/message/16022
答 4:
philips的正式答复From: "philips_marketing_usa" <philips_marketing_usa@...>
Date: Tue May 9, 2006 6:48 pm
Subject: Re: in production and no chips available !!! philips_mark...
Offline
Send Email
I apologize for the delay in responding to this thread.
In Q1, Philips was overwhelmed by a dramatic increase in demand as
many new designs went to production simultaneously. Even though we
were able to increase our chip production signifiCANtly, we still
were unable to keep up with the huge surge in demand.
We have increased production even further and are in the process of
getting ahead of the demand. By June, we should be completely
caught up and leadtimes should return to the 4-6 week range.
You should continue to expedite orders with your local
distributors. We are continually pulling in LPC2000 orders, so your
local contacts may be able to get you parts sooner than the original
confirmation date.
Please accept our sincerest apologies for the delays. It is a
testament to the success and acceptance of the LPC2000 family in the
marketplace that we have seen such an increase in demand. This
forum is undoubtedly an important factor in that success.
We believe that we have enough die and assembly production capacity
being put into place to keep leadtimes short and to keep our
distributors' shelves stocked with the most popular parts in the
future.
Sincerely,
Philips Microcontrollers Marketing and Sales
Date: Tue May 9, 2006 6:48 pm
Subject: Re: in production and no chips available !!! philips_mark...
Offline
Send Email
I apologize for the delay in responding to this thread.
In Q1, Philips was overwhelmed by a dramatic increase in demand as
many new designs went to production simultaneously. Even though we
were able to increase our chip production signifiCANtly, we still
were unable to keep up with the huge surge in demand.
We have increased production even further and are in the process of
getting ahead of the demand. By June, we should be completely
caught up and leadtimes should return to the 4-6 week range.
You should continue to expedite orders with your local
distributors. We are continually pulling in LPC2000 orders, so your
local contacts may be able to get you parts sooner than the original
confirmation date.
Please accept our sincerest apologies for the delays. It is a
testament to the success and acceptance of the LPC2000 family in the
marketplace that we have seen such an increase in demand. This
forum is undoubtedly an important factor in that success.
We believe that we have enough die and assembly production capacity
being put into place to keep leadtimes short and to keep our
distributors' shelves stocked with the most popular parts in the
future.
Sincerely,
Philips Microcontrollers Marketing and Sales
共2条
1/1 1 跳转至页
回复
有奖活动 | |
---|---|
【EEPW电子工程师创研计划】技术变现通道已开启~ | |
发原创文章 【每月瓜分千元赏金 凭实力攒钱买好礼~】 | |
【EEPW在线】E起听工程师的声音! | |
“我踩过的那些坑”主题活动——第001期 | |
高校联络员开始招募啦!有惊喜!! | |
【工程师专属福利】每天30秒,积分轻松拿!EEPW宠粉打卡计划启动! | |
送您一块开发板,2025年“我要开发板活动”又开始了! | |
打赏了!打赏了!打赏了! |
打赏帖 | |
---|---|
多组DCTODC电源方案被打赏50分 | |
【我踩过的那些坑】STM32cubeMX软件的使用过程中的“坑”被打赏50分 | |
新手必看!C语言精华知识:表驱动法被打赏50分 | |
【我踩过的那些坑】杜绑线问题被打赏50分 | |
【我踩过的那些坑】STM32的硬件通讯调试过程的“坑”被打赏50分 | |
【我踩过的那些坑】晶振使用的问题被打赏100分 | |
【我踩过的那些坑】电感选型错误导致的处理器连接不上被打赏50分 | |
【我踩过的那些坑】工作那些年踩过的记忆深刻的坑被打赏10分 | |
【我踩过的那些坑】DRC使用位置错误导致的问题被打赏100分 | |
我踩过的那些坑之混合OTL功放与落地音箱被打赏50分 |